Company History

2019

– Installed CTD, ADCP systems on R/V Tamgu 3 of NIFS

– Delivered Geostationary satellite data processing system to NIFS

– KMI 10m discuss buoy 2 set mooring

– KEPCO West sea Wave monitoring system(AMS) installation

– EGS Survey Pte Ltd SJC2 Cable route survey service

2018

Installed CTD, ADCP systems on R/V Saehaelim of KNU–

Installed CTD, ADCP systems on R/V Dongbaeg of CNU–

Installed CTD, ADCP systems on R/V Ala of JNU–

Delivered marine monitoring buoy to PNC Todo–

Delivered Underwater 3D scanner to KITECH–

KIGAM Socheongcho seismograph installation service–

2017

– Installed satellite data system for NIFS

– KEPRI Wido Marine Monitoring Buoy mooring

– Delivered Underwater 3D scanner to KEPRI

– KEPRI pCO2 marine monitoring buoy mooring

2016

Delivered GPS Drift buoy 40ea to KHOA–

EGS Survey Pte Ltd NCP Cable route survey service–

NDMI antenna transfer service–

KIOST Uljin buoy mooring–

Installed OSADCP on R/V Research1 of KNPS–

Installed CTD, OSADCP systems on R/V Insabu of KIOST–

2015

– Installed KMA LX-Band system

– Installed DAPA ROV 2D Sonar

– KIGAM Gosung buoy mooring service

– Installed CTD, OSADCP systems on R/V Arami3 of KOEM

2014

Installed CTD on R/V Tamgu21 of NIFS–

Delivered ADD WireWalker Profiler–

2014 SNU Superstation buoy recovery and mooring–

POSTECH Hupo buoy recover and mooring–

Installed OS75 on Tamhae2 of KIGAM–

2013

– Installed CTD on R.V Arami1 of KOEM

– Delivered CTD on R/V India Maritime

– Delivered POSTECH Sediment Trap system

– APG cable ruote servey service

2012

Installed CTD, ADCP systems on R/V Jera of JNU–

Delivered CTD on R/V Jangmok of KIOST–

SNU E-RAP buoy mooring–

Shell Singapore buoy manufacturing and mooring –

POSTECH Hupo bank buoy manufacturing and mooring–

2011

– NANO ligh technology marine sensor development task(3rd year)

– Deliverd CTD bottle system to KHOA R/V

– Delivered CTD bottle system to KCG R/V

– KIOST Jeju small buoy manufacturing and mooring

– SNU Heuksan Island buoy manufacturing and mooring

2010

Delivered CTD, ADCP systems to JNU R/V Jera–

Deliverd CTD system to KIOST R/V Jangmok2–

SNU E-RAP buoy manufacturing and mooring–

Shell Singapore buoy manufacturing and mooring–

POSTECH Hupo bank buoy manufacturing and mooring–

2009

ME Non-point polluted water quality measurement remote monitoring system task(3rd year)–

NANO ligh technology marine sensor development task(1st year) –

Delivered CTD, ADCP systems on Icebreaker of KOPRI–

KMA COMS saellite system delivery and installation–

KIOST X-Band satellite system delivery and installation–

Jeju Island marine monitoring buoy manufacturing and mooring–

2008

– 7th Anheung subsea environmental survey

– ME Non-point polluted water quality measurement remote monitoring system task(2nd year)

– Installed Gupo bridge Hydraulic Measurement System

– KMA satellite system delivery and installation

– TMA satellite system installation and technical support

– Dokdo marine monitoring buoy manufacturing and mooring

– MMA marine monitoring buoy manufacturing and mooring

2007

6th Anheung subsea environmental survey–

TPE pacific ocean optical cable ruote survey–

ME Non-point polluted water quality measurement remote monitoring system task(1st year)–

Installed automatic flow measurement system in Baekje, Panseong bridge–

2006

– 5th Anheung subsea environmental survey

– Jeju Island marine monitoring buoy manufacturing and mooring

– Installed automatic flow measurement system in Tongil, Junglang bridge

– Jinhae subsea cable ruote survey

– Installed ultrasonic flow measurement system in Yeoju bridge

2005

4th Anheung subsea environmental survey–

Patent application(ultrasonic flow measurement system) –

SMW4 Bangladesh subsea optical cable ruote laying service–

Installed Han river bridge automatic flow measurement system–

Marine research near Sam Island–

Mrine research near To Island–

2004

– Launced marine R/V Tamsa2 launch

– 3rd Anheung subsea environmental survey

– Submarine power cable laying service Gukhwa Island through Janggo port

– Submarine power cable laying service Nub Island through Norok Island

– Installed automatic flow measurement system in Nakdong River(Jindong)

– Installation and operation of special ROV for Topi Island navigation

2003

2nd Anheung subsea environmental survey–

Submarine power cable laying service Gukhwa Island through Janggo port–

East sea gas field pipeline construction navigation service–

Maritime ocean survey near Ongdo–

2002

– 1st Anheung subsea environmental survey

– PNU marine monitoring buoy manufacturing

– Ieado ocean research station marine survey

– Submarine power cable laying service Jindo through Baegyado

– Jinhae subsea power cable ruote marine survey

2001

Established R&D center in Otronix Co., Ltd.–

Signed agreement with Korea Maritime and Ocean University–

6 meter marine monitoring buoy manufacturing and mooring–

Manufacturered Saemangeum marine monitoring buoy–

Manufacturered Heuksan Island marine monitoring buoy–

Manufactured SNU marine monitoring buoy–

Subsea power cable ruote survey near Joyak Island through Saengil Island–

KJCN subsea optical cable route survey and laying service–

FNAL subsea optical cable route survey and laying service–

Marine survey on the cause of coastal erosion in Gangmun port–

2002

– Launched marine R/V Tamsa1

– Opened Donghae factory

– Signed agreement with SNU ocean circulation system lab

– Marine survey on buried ADD underwater sound source sensor

– C2C subsea optical cable ruote marine survey

– EAC subsea optical cable ruote marine survey

– Subsea power cable ruote marin survey near South sea coastal area

1999

Corporate Registration of Otronix Co., Ltd.–

Subsea power cable ruote marin survey near South sea coastal area–

Searched crashed P2V Neptune plane–

Subsea optical cable ruote survey near Geomundo Island –

Paldang Lake ROV & ADCP water quality inspection–

Searched missing wave-height meter–

1998

– R&D Center established

– Started marine instruments technical supoort and training

1997

부산앞바다 제3오성호 침몰선 탐색작업 –

1996

– Delivered marine instruments on R/V Haeyang2000 of KHOA

1995

Searching for the sinking tanker 1st yuil R/V near Pusan coastal area–

1994

– Established Otronix Co., Ltd. in Seoul in South Korea